Facility Expansion in Mexico: What Corporate Should Know About Equipment
Set Up Faster, Smarter, and With Fewer Surprises
Launching or expanding a facility in Mexico can unlock serious cost savings—but only if your equipment plan is ready. Delays in forklifts, racking systems, or charging infrastructure can create months of lost productivity.
3 Things Corporate Teams Overlook
- Lead Times: Even basic forklifts may have 6–8 week delays depending on specs and location.
- Electrical Infrastructure: Lithium-powered fleets need charging access planned from day one.
- Local Service Support: Your supplier must have boots on the ground near your plant.
We Support Global Teams Expanding in Mexico
AvanzaLift helps U.S. and international companies deploy forklift fleets and support systems across northern Mexico—from pre-install assessments to on-site training.
Faster Equipment Access
<ul>
<li>Local inventory options</li>
<li>Same-day delivery in key cities</li>
<li>Cross-border logistics experts</li>
</ul>
Local Service Teams
<ul>
<li>Rapid response coverage</li>
<li>Bilingual technical support</li>
<li>Warranty and preventive programs</li>
</ul>
U.S.–Mexico Coordination
<ul>
<li>Corporate reporting formats</li>
<li>One point of contact</li>
<li>English/Spanish documentation</li>
</ul>
<h4><strong>Find us at:</strong></h4>
Blvd. de las Bellas Artes 20751-A, Las Torres Parte Baja, Cd Industrial, 22444 Tijuana, B.C.
<h2>Frequently Asked Questions</h2>
We’re here to help
Yes, we help assess equipment needs, electrical capacity, and delivery logistics before launch.
Most standard units can be delivered in 1–2 business days in Northern Mexico. Special orders take longer.
Absolutely. We offer bilingual support and updates tailored to U.S. reporting standards.
Yes, we provide equipment installation, maintenance setup, and operator training in Spanish.
Yes, with scheduled maintenance, service plans, and on-demand repairs across Baja and Northern Mexico.
Designed with local realities in mind.
We bridge U.S. corporate goals and Mexican execution.
Start productive from day one.